Fridge/freezer Assembly Line
The freezer assembly line typically includes the following key steps:
Cabinet Assembly: Assembling the external frame and door of the freezer.
Lining Installation: Securing the inner lining within the cabinet.
Refrigeration System Assembly: Installing the compressor, evaporator, and condenser.
Electrical System Installation: Laying out electrical wiring and installing the control board.
Door Seal Assembly: Attaching the door gasket to ensure cold air is retained.
Temperature Control System Installation: Installing the thermostat and sensors.
Shelf and Drawer Installation: Mounting internal shelves and drawers.
Performance Testing: Testing the cooling efficiency and electrical safety of the freezer.
Leak Detection: Checking for refrigerant leaks.
Final Inspection: Completing the final quality and functionality tests.
Cleaning and Packaging: Cleaning the freezer and preparing it for packaging and shipment.
Quality Audit: Ensuring the product meets the factory standards.
These steps ensure the freezer's cooling efficiency, durability, and customer satisfaction.
Notes:All pictures are just for your reference. Product appearance depends on final design and goods.
About Jianggong
Zhejiang Jianggong Automation Equipment Co., Ltd. is a well-known factory automation assembly production line manufacturing company. After decades of development, the company has provided high-quality assembly line equipment to numerous manufacturing enterprises worldwide.
Vehicle manufacturing production line, household appliance assembly line, 3C electronic product manufacturing equipment, green energy product manufacturing production line, etc